View unanswered posts | View active topics It is currently Thu Mar 28, 2024 12:49 pm



Reply to topic  [ 3 posts ] 
 Time Table Showing U.S. Nuclear Reactors Inseption 
Author Message
Moderator
User avatar

Joined: Mon Jan 28, 2013 7:40 pm
Posts: 2885
Location: Illinois
This is an interesting time table. Only the U.S. nuclear reactors that are currently active are listed, except for San Onofre that I can see.


Attachments:
Screenshot 2016-06-15 at 10.24.08 AM.png
Screenshot 2016-06-15 at 10.24.08 AM.png [ 25.97 KiB | Viewed 69912 times ]

_________________
MY OUTSIDE RADIATION MONITORING STATION:
South Beloit, Illinois - GMC200 Outside on HEPA air purifier, ground level, facing West.
http://netc.com/chart/view.php?n=1%3AEB5A139C
Wed Jun 15, 2016 10:52 am
Profile
Moderator
User avatar

Joined: Mon Jan 28, 2013 7:40 pm
Posts: 2885
Location: Illinois
Here is a quote from the same link/article that I got the time table graph from.

Quote:
Although Watts Bar 2 is the first new U.S. nuclear generator to come online in 20 years, four other reactors are currently under construction and are expected to join the nuclear fleet within the next four years. Vogtle Electric Generating Plant Units 3 and 4 in Georgia and Virgil C. Summer Nuclear Generating Station Units 2 and 3 in South Carolina are scheduled to become operational in 2019–20, adding 4,540 MW of generation capacity.


http://www.eia.gov/todayinenergy/detail.cfm?id=26652

_________________
MY OUTSIDE RADIATION MONITORING STATION:
South Beloit, Illinois - GMC200 Outside on HEPA air purifier, ground level, facing West.
http://netc.com/chart/view.php?n=1%3AEB5A139C


Wed Jun 15, 2016 10:53 am
Profile
Moderator
User avatar

Joined: Mon Jan 28, 2013 7:40 pm
Posts: 2885
Location: Illinois
It is not surprising to anyone following nuclear power that estimated construction costs, decommission costs and time table of completion are always WRONG!

Quote:
Construction on Watts Bar Unit 2 originally began in 1973, but construction was halted in 1985 after the NRC identified weaknesses in TVA's nuclear program. In August 2007, the TVA board of directors authorized the completion of Watts Bar Unit 2, and construction started in October 2007. At that time, a study found Unit 2 to be effectively 60% complete with $1.7 billion invested. The study said the plant could be finished in five years at an additional cost of $2.5 billion. However, both the timeline and cost estimate developed in 2007 proved to be overly optimistic, as construction was not completed until 2015, and costs ultimately totaled $4.7 billion.


SOURCE LINK
http://www.eia.gov/todayinenergy/detail.cfm?id=26652

_________________
MY OUTSIDE RADIATION MONITORING STATION:
South Beloit, Illinois - GMC200 Outside on HEPA air purifier, ground level, facing West.
http://netc.com/chart/view.php?n=1%3AEB5A139C


Wed Jun 15, 2016 11:02 am
Profile
Display posts from previous:  Sort by  
Reply to topic   [ 3 posts ] 

Who is online

Users browsing this forum: No registered users and 31 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group
Designed by STSoftware.