View unanswered posts | View active topics It is currently Tue Apr 16, 2024 12:28 am



Reply to topic  [ 4 posts ] 
 Savannah River Site Not Shown On NETC Map 
Author Message
Moderator
User avatar

Joined: Mon Jan 28, 2013 7:40 pm
Posts: 2885
Location: Illinois
When trying to track down a radiation source from the S.C. area keep in mind that the Savannah River Site's several reactors are not currently shown on the NETC map.
http://en.wikipedia.org/wiki/Savannah_River_Site
http://www.srs.gov/general/about/where1.htm
Image

_________________
MY OUTSIDE RADIATION MONITORING STATION:
South Beloit, Illinois - GMC200 Outside on HEPA air purifier, ground level, facing West.
http://netc.com/chart/view.php?n=1%3AEB5A139C


Tue May 06, 2014 12:55 pm
Profile
Moderator
User avatar

Joined: Mon Jan 28, 2013 7:40 pm
Posts: 2885
Location: Illinois
Quote:
In 2000, the United States and Russia signed an agreement in which each country would convert 34 metric tons of surplus weapons-grade plutonium into a form no longer useful for weaponry. They also would have to approve the other side’s method, and the International Atomic Energy Agency would serve as monitor.

For both countries, the idea was to mix the plutonium with uranium to make mixed-oxide (MOX) fuel for use in reactors that produce electrical power.

While Russia chose to use its MOX in what are known as fast reactors, the United States initially chose using MOX in light-water reactors. The overall U.S. approach required constructing a new MOX facility, another to disassemble the nuclear weapon triggers (or “pits”) and a facility to handle radioactive waste.

It also required finding a buyer for the reactor fuel.

In 2002, the Energy Department estimated the total cost of the MOX project over 20 years would be $3.8 billion. The department’s facility at Savannah River, S.C., was chosen as the site for the plutonium conversion.


http://www.washingtonpost.com/world/national-security/destroying-and-building-nuclear-weapons-have-something-in-common-high-overruns/2014/05/05/75b2bb40-d22e-11e3-9e25-188ebe1fa93b_story.html

_________________
MY OUTSIDE RADIATION MONITORING STATION:
South Beloit, Illinois - GMC200 Outside on HEPA air purifier, ground level, facing West.
http://netc.com/chart/view.php?n=1%3AEB5A139C


Tue May 06, 2014 1:08 pm
Profile
Moderator
User avatar

Joined: Mon Jan 28, 2013 7:40 pm
Posts: 2885
Location: Illinois
Interesting that now there is an EPA station that is in RADCON 5 in this same area!

_________________
MY OUTSIDE RADIATION MONITORING STATION:
South Beloit, Illinois - GMC200 Outside on HEPA air purifier, ground level, facing West.
http://netc.com/chart/view.php?n=1%3AEB5A139C


Mon May 12, 2014 10:45 am
Profile
Site Admin
User avatar

Joined: Mon Jan 28, 2013 6:51 pm
Posts: 741
Location: Arkansas
The station in Martinez, GA, US on Netc.com would be Radcon-4 if it wasn't a new station. Each station must be 30 days old before they get above green.


Mon May 12, 2014 11:23 am
Profile
Display posts from previous:  Sort by  
Reply to topic   [ 4 posts ] 

Who is online

Users browsing this forum: No registered users and 33 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group
Designed by STSoftware.